Connek SPECIALITIES

  • Splicing, Termination and Testing Loose Tube Ribbon Mechanical OTDR Trace Interrogation
  • Troubleshooting
  • Telecommunication Infrastructure Pit and Pipe Installation Trenching Boring NDD Methods
  • Specialties NBN Construction Telstra Network Augmentation Greenfield Construction
  • Installation of Fibre Optic and Coaxial Cables Underground Aerial

Our teams have access to a huge fleet of plant and equipment inclusive of the following:

  • Grundomats
  • Directional drillers
  • Spitwaters
  • Vacuum trucks
  • Excavators

Performance objectives and targets

The following objectives and targets are set up for our projects
No Objective Target Performance
Indicator
1 Internal audits conducted 100% of audits conducted as scheduled 100%
2 Effective communication and consultation At least one toolbox talk held per week per project 1 pw
3 Audit reports reviewed and closed out
(internal and external)
100% of audit responses completed within 14 days. 100%
4 Community complaints responded to promptly 100% of complaints closed out within 5 working days 100%
5 Customer satisfaction 100% of projects delivered to customer satisfaction 100%
6 OHS & environmental legal requirements
complied with
No penalties or notices received Zero
7 Lost time injuries Zero LTI’s for the life of the project Zero
8 OHS & environmental workplace
inspections completed
100% of planned inspections carried out 100%
9 IMS awareness 100% of employees & subcontractors are
inducted prior to start works
100%

Performance objectives and targets

The following objectives and targets are set up for our projects
No Objective Target Performance Indicator
1 Internal audits conducted 100% of audits conducted as scheduled 100%
2 Effective communication and consultation At least one toolbox talk held per week per project 1 pw
3 Audit reports reviewed and closed out (internal and external) 100% of audit responses completed within 14 days. 100%
4 Community complaints responded to promptly 100% of complaints closed out within 5 working days 100%
5 Customer satisfaction 100% of projects delivered to customer satisfaction 100%
6 OHS & environmental legal requirements complied with No penalties or notices received Zero
7 Lost time injuries Zero LTI’s for the life of the project Zero
8 OHS & environmental workplace inspections completed 100% of planned inspections carried out 100%
9 IMS awareness 100% of employees & subcontractors are inducted prior to start works 100%

Management system implemented and controlled using the following tools:

  • Environmental risk assessments
  • Hazard risk assessment
  • Toolbox talks
  • Emergency preparedness plans
  • Induction register
  • Daily Risk Assessments

We complete the following audits as part of our Project management:

  • Self-audits
  • Management walk out
  • Tool and vehicle audits
  • Subcontractor surveillance audits

AUDITS CONDUCTED USING iAUDITOR

iAuditor allows workers to conduct audits and in real-time quickly evaluate safety and quality.

We can complete inspections from anywhere on any mobile or tablet device and our teams all use this tool generating detailed inspections and risk assessment reports allowing us a valuable insight into field works and allowing us to fix problems faster.

Using this tool we are able to manage our inspection and reporting procedures helping us towards the goal of 100% Health and Safety compliance.

We encourage our teams to complete self-audits and regularly invite collaborations on safety issues, encourage all feedback and suggestions every member of the Connek team as well as our clients.

PROWORKFLOW

Connek utilises ProWorkflow which is a cloud-based project management and time tracking software.

Using this application we are able to manage our task management, timesheets, templates, notifications and alerts, file sharing, workflow management, contact management, reporting and resource management to ensure the smooth running of our Projects.

We have captured the data of every accreditation held by our workforce, all insurances, IDs, Vehicle registrations and gas detector calibrations dates. Expiry alerts are followed up by our Operations Support well before expiry of the document. This ensures our field staff are always 100% compliant, tools and
equipment are tagged and maintained and all insurances are up to date.

Since its inception in 2014 Connek has run multiple teams across the following projects:

Vision stream

FSD Internal activations and lead ins NSW, lead in remediation

Telstra FIR Rodding and Roping

VIC and NSW

Service Stream

Dias Pit Remediation VIC and FSD internal activations

Kordia

Rural Rodding and Roping project WA and SA

Tech Mahindra

RF Drive testing VIC

Downer EDI

Civils Pit Remediation NSW

Tech 2 Home

Rural Rodding and Roping NSW

Skybridge

FTTB Surveys NSW

Cyient

FTTB / FTTP Surveys and FTTB / FTTP design NSW and VIC and SA

BSA

OMMA lead in remediation VIC

CPS Emnion

Rodding and Roping NSW

Planning

Our technical consultants carry out high-level planning at the start of each project, and conduct continuous assessment throughout project phase. We ensure that we have the right people, resources, methodologies, and supporting tools in place for each planning phase, so that we can deliver the project on time, on budget, and to appropriate quality standards.

Communication

Connek understands that communication is a vital component to ensure business continuity across team members, the project board, the different stakeholders within the business, and relevant third parties. Connek holds regular teams meetings and submits daily/weekly/month reports to prevent inadequate communication and known frequent problem area for projects.